Twenty Years of Providing Hydrology and Hydraulics Solutions Celebrating 2001

MAJOR IMPROVEMENTS for 2001 Release

Rational Method, Flood Hydrograph Routing, and Pipeflow Systems Programs

·   New “look and feel” options (see enclosed figures)

·   New Help file tools (see enclosed figures)

Rational Method Program

·    New culvert sizing and deficiency analysis tools

·   Channel deficiency analysis tool

·   V-Gutter deficiency analysis tool

·   Variable Manning’s friction factors for Street Section Analysis

Flood Hydrograph Routing Program

·   New Graphic output routine (see enclosed figures)

SIMS Program

·   Additional cost estimator module (including contingencies and point cost)

·   New cost output format

·   Additional cost-to-benefit Index module features

Numerous other enhancements for 2001 release include:

·   Upgrade to Most Recent Software Development Tools

·   Latest Microsoft Patches



Recent Master Plan of Drainage Studies using AES SIMS:



City of Beverly Hills

City of Corona

City of Fullerton>

City of Los Angeles>

County of San Diego

City of Torrance

City of Vista



New Pull-down Menus and Windows Based Input Options for Rational Method, Flood Hydrograph Routing, and Pipeflow Systems Programs:

..



Multiple Input Options for User Handling:

Options for Using Combined Pull Down Menu and Data Base Input Modes:



AES Input Data File Selection:



Editor Window:

New AES Help Options:

New Help Feature: AES Professor

Hydrograph Output Windows for Flood Hydrograph Routing Program:

Maximized Hydrograph Window:

..

(A hard copy printout of the above hydrograph is shown on next page.)



Flood Hydrograph Routing Program: Example Graphic Output

..

Example of New Cost Opinion Module Output

*---------------------------------------------------------------------------------------*

*                             FACILITY COST OPINION SUMMARY                             *

* STRING FILENAME: SF0048ZZ.ZST                                                         *

* MOST UPSTREAM NODE: SF030126.0                       MOST DOWNSTREAM NODE: SF030153.0 *

*---------------------------------------------------------------------------------------*

   FACILITY                               FACILITY     UNIT      UNIT      FACILITY

   DESCRIPTION                            QUANTITY     TYPE      COST        COST

   -------------------------------------------------------------------------------------

   ---------------------------------------

   NODE SF030126.0 TO NODE SF030127.0

   RCP CULVERT  2@  5.50' (Replacement System)

   EXCAVATION                                 53.9     L.F.     64.94    $      3503.05

   BACKFILL                                   53.9     L.F.     40.99    $      2210.98

   PIPE                                       53.9     L.F.    264.00    $     14240.16

   PAVEMENT REMOVAL & REPLACEMENT             53.9     L.F.     18.94    $      1021.49

   ---------------------------------------

   NODE SF030128.0 TO NODE SF030129.0

   RCP CULVERT  2@  6.00' (Replacement System)

   EXCAVATION                                 70.5     L.F.     73.33    $      5168.53

   BACKFILL                                   70.5     L.F.     44.83    $      3159.36

   PIPE                                       70.5     L.F.    288.00    $     20298.24

   PAVEMENT REMOVAL & REPLACEMENT             70.5     L.F.     20.25    $      1427.22

   ---------------------------------------

   NODE SF030131.0 TO NODE SF030132.0

   RCB CULVERT 10.00' (W) x   8.00' (H) (Replacement System)

   EXCAVATION                                 35.4     L.F.    136.63    $      4839.28

   BACKFILL                                   35.4     L.F.     54.07    $      1915.30

   RCB                                        35.4     L.F.    931.69    $     33000.36

   PAVEMENT REMOVAL & REPLACEMENT             35.4     L.F.     30.00    $      1062.60

   ---------------------------------------

   NODE SF030133.0 TO NODE SF030134.0

   RCB CULVERT 10.00' (W) x   8.00' (H) (Replacement System)

   EXCAVATION                                 40.6     L.F.    136.63    $      5551.10

   BACKFILL                                   40.6     L.F.     54.07    $      2197.03

   RCB                                        40.6     L.F.    931.69    $     37854.45

   PAVEMENT REMOVAL & REPLACEMENT             40.6     L.F.     30.00    $      1218.90

   ---------------------------------------

   NODE SF030140.0 TO NODE SF030141.0

   RCB CULVERT 13.00' (W) x   8.00' (H) (Replacement System)

   EXCAVATION                                 42.2     L.F.    167.37    $      7054.49

   BACKFILL                                   42.2     L.F.     62.96    $      2653.89

   RCB                                        42.2     L.F.   1094.65    $     46139.50

   PAVEMENT REMOVAL & REPLACEMENT             42.2     L.F.     36.75    $      1549.01

   ---------------------------------------

   NODE SF030145.0 TO NODE SF030146.0

   RCB CULVERT 18.00' (W) x   8.00' (H) (Replacement System)

   EXCAVATION                                 31.6     L.F.    218.60    $      6918.72

   BACKFILL                                   31.6     L.F.     77.78    $      2461.67

   RCB                                        31.6     L.F.   1366.26    $     43241.97

   PAVEMENT REMOVAL & REPLACEMENT             31.6     L.F.     48.00    $      1519.20

   ---------------------------------------

   NODE SF030147.0 TO NODE SF030148.0

   RCB CULVERT 18.00' (W) x   8.00' (H) (Replacement System)

   EXCAVATION                                 18.8     L.F.    218.60    $      4116.25

   BACKFILL                                   18.8     L.F.     77.78    $      1464.56

   RCB                                        18.8     L.F.   1366.26    $     25726.58

   PAVEMENT REMOVAL & REPLACEMENT             18.8     L.F.     48.00    $       903.84

   ---------------------------------------

   NODE SF030149.0 TO NODE SF030150.0

   RCB CULVERT 19.50' (W) x   8.00' (H) (Replacement System)

   EXCAVATION                                 19.5     L.F.    233.97    $      4571.80

   BACKFILL                                   19.5     L.F.     82.22    $      1606.62

   RCB                                        19.5     L.F.   1447.74    $     28288.77

   PAVEMENT REMOVAL & REPLACEMENT             19.5     L.F.     51.38    $      1003.87

   ---------------------------------------

   NODE SF030152.0 TO NODE SF030153.0

   RCP CULVERT  3@  5.50' (Parallel System)   

   EXCAVATION                                217.5     L.F.     64.94    $     14125.19

   BACKFILL                                  217.5     L.F.     40.99    $      8915.24

   PIPE                                      217.5     L.F.    264.00    $     57420.00

   PAVEMENT REMOVAL & REPLACEMENT            217.5     L.F.     18.94    $      4118.91

   ---------------------------------------

   -------------------------------------------------------------------------------------

                                                             Sub-Total = $    402468.13

                    20.00% of Total Cost as Construction Contingencies = $     80493.62

      20.00% of Total Cost as Engineering/Administration Contingencies = $     80493.62

                                                                 Total = $    563455.38

AES   NEW!  Features in the AES2001 Release   AES Software   Frequently Asked Questions   AES Developers   Representative Clients and Projects


Web 2.0 Online Dating Service with Dating Games: www.FirstClickFriend.com
Advanced Engineering Software Articles catalogue