MAJOR IMPROVEMENTS for 2001 ReleaseRational Method, Flood Hydrograph Routing, and Pipeflow Systems Programs· New “look and feel” options (see enclosed figures) · New Help file tools (see enclosed figures) Rational Method Program· New culvert sizing and deficiency analysis tools · Channel deficiency analysis tool · V-Gutter deficiency analysis tool · Variable Manning’s friction factors for Street Section Analysis Flood Hydrograph Routing Program· New Graphic output routine (see enclosed figures) SIMS Program· Additional cost estimator module (including contingencies and point cost) · New cost output format · Additional cost-to-benefit Index module features Numerous other enhancements for 2001 release include:· Upgrade to Most Recent Software Development Tools · Latest Microsoft Patches Recent Master Plan of Drainage Studies using AES SIMS: City of Beverly Hills City of Corona City of Fullerton> City of Los Angeles> County of San Diego City of Torrance City of Vista New Pull-down Menus and Windows Based Input Options for Rational Method, Flood Hydrograph Routing, and Pipeflow Systems Programs:
Multiple Input Options for User Handling: Options for Using Combined Pull Down Menu and Data Base Input Modes: AES Input Data File Selection: Editor Window: New AES Help Options: New Help Feature: AES ProfessorHydrograph Output Windows for Flood Hydrograph Routing Program: Maximized Hydrograph Window:
(A hard copy printout of the above hydrograph is shown on next page.) Flood Hydrograph Routing Program: Example Graphic Output
Example of New Cost Opinion Module Output *---------------------------------------------------------------------------------------* * FACILITY COST OPINION SUMMARY * * STRING FILENAME: SF0048ZZ.ZST * * MOST UPSTREAM NODE: SF030126.0 MOST DOWNSTREAM NODE: SF030153.0 * *---------------------------------------------------------------------------------------* FACILITY FACILITY UNIT UNIT FACILITY DESCRIPTION QUANTITY TYPE COST COST ------------------------------------------------------------------------------------- --------------------------------------- NODE SF030126.0 TO NODE SF030127.0 RCP CULVERT 2@ 5.50' (Replacement System) EXCAVATION 53.9 L.F. 64.94 $ 3503.05 BACKFILL 53.9 L.F. 40.99 $ 2210.98 PIPE 53.9 L.F. 264.00 $ 14240.16 PAVEMENT REMOVAL & REPLACEMENT 53.9 L.F. 18.94 $ 1021.49 --------------------------------------- NODE SF030128.0 TO NODE SF030129.0 RCP CULVERT 2@ 6.00' (Replacement System) EXCAVATION 70.5 L.F. 73.33 $ 5168.53 BACKFILL 70.5 L.F. 44.83 $ 3159.36 PIPE 70.5 L.F. 288.00 $ 20298.24 PAVEMENT REMOVAL & REPLACEMENT 70.5 L.F. 20.25 $ 1427.22 --------------------------------------- NODE SF030131.0 TO NODE SF030132.0 RCB CULVERT 10.00' (W) x 8.00' (H) (Replacement System) EXCAVATION 35.4 L.F. 136.63 $ 4839.28 BACKFILL 35.4 L.F. 54.07 $ 1915.30 RCB 35.4 L.F. 931.69 $ 33000.36 PAVEMENT REMOVAL & REPLACEMENT 35.4 L.F. 30.00 $ 1062.60 --------------------------------------- NODE SF030133.0 TO NODE SF030134.0 RCB CULVERT 10.00' (W) x 8.00' (H) (Replacement System) EXCAVATION 40.6 L.F. 136.63 $ 5551.10 BACKFILL 40.6 L.F. 54.07 $ 2197.03 RCB 40.6 L.F. 931.69 $ 37854.45 PAVEMENT REMOVAL & REPLACEMENT 40.6 L.F. 30.00 $ 1218.90 --------------------------------------- NODE SF030140.0 TO NODE SF030141.0 RCB CULVERT 13.00' (W) x 8.00' (H) (Replacement System) EXCAVATION 42.2 L.F. 167.37 $ 7054.49 BACKFILL 42.2 L.F. 62.96 $ 2653.89 RCB 42.2 L.F. 1094.65 $ 46139.50 PAVEMENT REMOVAL & REPLACEMENT 42.2 L.F. 36.75 $ 1549.01 --------------------------------------- NODE SF030145.0 TO NODE SF030146.0 RCB CULVERT 18.00' (W) x 8.00' (H) (Replacement System) EXCAVATION 31.6 L.F. 218.60 $ 6918.72 BACKFILL 31.6 L.F. 77.78 $ 2461.67 RCB 31.6 L.F. 1366.26 $ 43241.97 PAVEMENT REMOVAL & REPLACEMENT 31.6 L.F. 48.00 $ 1519.20 --------------------------------------- NODE SF030147.0 TO NODE SF030148.0 RCB CULVERT 18.00' (W) x 8.00' (H) (Replacement System) EXCAVATION 18.8 L.F. 218.60 $ 4116.25 BACKFILL 18.8 L.F. 77.78 $ 1464.56 RCB 18.8 L.F. 1366.26 $ 25726.58 PAVEMENT REMOVAL & REPLACEMENT 18.8 L.F. 48.00 $ 903.84 --------------------------------------- NODE SF030149.0 TO NODE SF030150.0 RCB CULVERT 19.50' (W) x 8.00' (H) (Replacement System) EXCAVATION 19.5 L.F. 233.97 $ 4571.80 BACKFILL 19.5 L.F. 82.22 $ 1606.62 RCB 19.5 L.F. 1447.74 $ 28288.77 PAVEMENT REMOVAL & REPLACEMENT 19.5 L.F. 51.38 $ 1003.87 --------------------------------------- NODE SF030152.0 TO NODE SF030153.0 RCP CULVERT 3@ 5.50' (Parallel System) EXCAVATION 217.5 L.F. 64.94 $ 14125.19 BACKFILL 217.5 L.F. 40.99 $ 8915.24 PIPE 217.5 L.F. 264.00 $ 57420.00 PAVEMENT REMOVAL & REPLACEMENT 217.5 L.F. 18.94 $ 4118.91 --------------------------------------- ------------------------------------------------------------------------------------- Sub-Total = $ 402468.13 20.00% of Total Cost as Construction Contingencies = $ 80493.62 20.00% of Total Cost as Engineering/Administration Contingencies = $ 80493.62 Total = $ 563455.38 |
|